top of page

Area of Interest 5

​Preliminary Alternative 5.1

  • New storm drain in the S Briar corridor extending to 24th St/Broadway Rd intersection

  • Increase storage capacity in the storage basin at Robson Elementary School fields (requires agency partnership agreement)

  •  Connect Robson Elementary School basin to existing storm drain system in Gilbert Rd corridor

 

Preliminary Alternative 5.2

  • New storm drain system in 24th St corridor from Broadway Rd to Pueblo Ave

  • Potential new underground storage facility under existing church parking lot at northwest corner of 24th St/Pueblo Ave (requires agency/organization partnership agreement)

 

Preliminary Alternative 5.3

  • New storm drain system in 24th St corridor and S Briar corridor from Broadway Rd to Silvergate Park

  • Expand storm water storage capacity at Silvergate Park

Area of Interest (AOI) 5 is located along 24th Street and Broadway Road.  

Stop or move at your speed by using the slider 

This legend explains the approximate depth of water during a 100-year flood event 

Maximum Depth Legend.jpeg

For a closer look, download the AOI 5 aerial map or AOI 5 100-year flood map

Project Information: 602.532.6222

bottom of page